Jump to content

[21st May | 14-21z] CPH Overload


Daniel Olsen (1429594)
 Share

Recommended Posts

Daniel Olsen (1429594)

CPH Overload on the 21st of May between 14 and 21z. If you are able, please sign up below!

Link to comment
Share on other sites

Lukas Agerskov (1226374)

Able

Link to comment
Share on other sites

Thomas Broegger (1447687)

Able S2,5 (TMA positions only Departure)

Link to comment
Share on other sites

Simon Larsen (1396173)

Able (would prefer to end 1-2 hours early, if possible)

Edited by Simon Larsen
Would like to end early
Link to comment
Share on other sites

  • 2 weeks later...
Peter Toft (1280555)

Able from 15z. 

Edited by Peter Toft
Link to comment
Share on other sites

Morten Jelle (1012739)

Able.

Unable.

Edited by Morten Jelle
Not able afterall..
  • Sad 1

Morten Jelle
VATSIM Network Supervisor - Team Lead

Link to comment
Share on other sites

  • 3 weeks later...
Adrian Bjerke (1339353)

Able if needed

Adrian Bjerke
Training Director

Link to comment
Share on other sites

Mikkel Lindgren (1003540)

Able, C1

Best regards

 

Mikkel Lindgren

Mentor and Examinator

Link to comment
Share on other sites

Lukas Agerskov (1226374)

@Viktor Espenhain @Frederik Pedersen @Peter Toft @Daniel Andersen @Mikkel Lindgren @Simon Larsen @Adrian Bjerke @Kenneth Hald @Jakob Ek Jensen @Soeren Juul @Esben Madsen

Staffing for Overload is out. It can be downloaded as a PDF or viewed as a picture. Please note, there may be mistakes, if so, the top one is the governing.

 

Now to some notes and briefings (as always)

 

A note to all: If you CAN, WILL and have the capabilities with OBS, please record your controlling shift, as I need as many videos as possible for the new S2 Training currently in development for the students to study. It doesn't have to be a perfect session for it to be useful.

Also please consider to read up on the Self-Briefings if you are not familiar with a position you sit on: https://moodle.vatsim-scandinavia.org/course/view.php?id=22

Please check you all have r33 version of euroscope + version 2.4.0.7 of TOPSKY

EKCH_DEL: TSATs are not required, but if you like to have a bit more to do on DEL you can use them. Guide is here: https://vatsim-scandinavia.org/applications/core/interface/file/attachment.php?id=3807&key=ffef864e02b7126cd6b85b831954bc48.

EKCH_D_TWR: There will be periods with two APP online but no DEP online, so MAKE SURE you know which frequency the different SIDs needs to go to.

EKDK_B_CTR: There will be holdings, and delays. Please do not wait for Approach to call holdings. just don't allow more than what is possible for APP to handle. The best way to do this is using the "operation rate" tool, which can predict the hourly rate going into Copenhagen. EKDK_B_CTR should not accept an average higher than 40 pr. hour. I have made a small tutorial on how to use the tool here: https://drive.google.com/file/d/1SQJnA1OcfCiYUmBwD3TjhD22eH7GApa8/view?usp=sharing

EKCH_A_TWR/EKCH_F_APP: We will run with reduced separation, so 3nm spacing is allowed, so EKCH_A_TWR needs to be aware of expeditious exiting from the runway.

 

image.thumb.png.b054d37975f3148c6ff667e55e418d2f.png

Staffing Overload.pdf

  • Like 2
Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

×
×
  • Create New...